Info |
---|
Energy Meter detailsSupported energy meter: EVHEM217 (Carlo Gavazzi EM2172RVV23XOSX) • Connect the energy meter to terminals 1 [B+], 2 [A-] and 3 [GND]. • Use a twisted pair instrumentation cable RS-485 when you connect the energy meter to the charging station. • Recommended cable type: NESMAK-HF 2x2x0,5+0,5 or similar. • The system has been tested with 100 m cable length. • Make sure that the RS-485 baud rate is equal in the charging station and the energy meter. • Do not change EVHEM217 Modbus default parameters. Modbus: client ID 1 Databits: 8 Parity: none Stopbits: 1 • Make sure that the signal wires are connected correctly to the energy meter. • Terminate the transmission line in accordance with the wiring example. Dry Contact Details• Connect a dry contact module for override mode to the terminals 4 and 5. Remove the jumper from the pre-installed connector. Note! If you do not connect a dry contact module to thecharging station, do not remove the jumper or change therelated settings in the Charger Control application.• The default setting for external control is NC (normally closed). When the contact is closed, charging is allowed. When the contact is opened, charging is not allowed. • If you install the external control as NO (normally open), change the settings accordingly in the Charger Control application. |
...